WellSpan Digestive Health Center
York Excavating Company, as a Design Assist Partner, worked with the construction manager and ownership team for approximately 3 months, budgeting schematic designs, while offering their expertise and value engineering ideas on critical design elements associated with this project.

default
As a result of these design assist efforts, YEC ultimately worked through a prime contract with the CM to develop the site of this new medical facility. Project scope included installation & maintenance of erosion & sediment controls, clearing, mass grading, segmental block retaining wall systems, sanitary sewer and water main installation, stormwater conveyance, installation of three underground stormwater chamber systems, primary electrical pathway excavation/backfill, fine grading and pouring of concrete curbs, fine grading and installation of concrete & asphalt stone bases, pouring of rigid concrete pavement and sidewalks, asphalt paving, completion of significant PennDot Roadway Improvements, installation of landscape plantings, permanent seeding, sod and installation of various site amenities such as bollards, fencing, guiderail, line painting and signage.